TradeLEORegisterLogin | Set Homepage | Save desktop | Mobile | Qr code
Member
Beijing Zulin Formwork & Scaffolding Company
High Rise & Super High Rise Building Formwork;Building Formwork;Industria...
 
Your current location:Home » Sell » Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydrauli...

Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic system

Click image to view full size image
Title: Steady , synchronous Pier formwork , Shoring Tower Climbing Formwork hydraulic system 
Brand: -
Model: -
Unit price: Negotiable
MOQ: -0 -
Quantity: Negotiable
Delivery date: Since the payment date Days delivery

Contact: Andy Liang (Ms.)    
Mobile:
Telephone:

  Inquiry
Details

Steady , synchronous and safe Auto Self Climbing Formwork QPMX-50

 

Descrition: 

The lifting power of the Formwork QPMX-50 comes from its hydraulic system, which includes the oil cylinder 

and commutator. Through functioning of hydraulic system, the steel rail and bracket can climb up alternately, 

so the whole formwork system climbs steadily, independent of a crane. It' s easy to operate, and climbing is fast and safe.

 

Structure 


 

The Characteristics 


1. One oil cylinder unit can lift 50KN.
2. The QPMX-50 system can climb not only vertically but also slantwise, and the forward or backward inclination 

can be up to 18 degrees.
3. The system can climb up wholly or separately. The climbing process is steady, synchronous and safe.
4 .The bracket does not come back to the ground until construction work is finished, and spacing for work is

 reduced while the bumping damage is almost completely prevented, especially for the plywood.
5The error of structure construction is tiny and easy to correct.
6The formwork can climb up by itself and cleaning work can be done in situ. The number of crane lifts are 

greatly reduced.

 

Standard Climbing Process 


1. Set up the formwork by wall-through tie-rods and pull-push props, embed anchors and do the first concrete 

pouring.
2.  Remove the formwork after the first pouring and fix anchor shoes on the finished wall, lift the brackets and 

formwork

 to the right position, match the formwork and do the second pouring.
3. Lift formwork and brackets to the higher floor; fix climbing rail and hydraulic system.
4. Match the formwork to the right position and do the third pouring.
5. Strip the formwork and fix anchor shoes on the finished wall, then let the climbing rails climb.
6. Brackets climb up to the right position, then install suspended platform.
7. Match the formwork, do the concrete pouring, and proceed into the standard climbing stage.
 

Project:

Suramadu Bridge(Indonesia)

Client:

China Road & Bridge Corporation

Date:

09/2006

Formwork  Type:

Hydraulic Automatic Climbing Formwork

Comments of client:

Inquiry
Sell
  • No Category
New Login
Company QR code
Anytime Anywhere Mobile